{"id":4,"date":"2007-08-19T16:58:57","date_gmt":"2007-08-19T23:58:57","guid":{"rendered":"http:\/\/www.nocapx2020.info\/?page_id=4"},"modified":"2024-03-30T17:16:07","modified_gmt":"2024-03-30T22:16:07","slug":"maps-capx-2020","status":"publish","type":"page","link":"https:\/\/nocapx2020.info\/?page_id=4","title":{"rendered":"Maps &#8211; CapX 2020"},"content":{"rendered":"<p>It just never ends. They can&#8217;t ever have enough transmission, and the &#8220;Public&#8221; Utility\/Service Commissions haven&#8217;t seen a transmission they don&#8217;t like.<\/p>\n<p>As if <a href=\"https:\/\/gridnorthpartners.com\/\"><strong>CapX 2020 (now &#8220;Grid North Partners&#8221;)<\/strong> <\/a>and the <a href=\"https:\/\/cdn.misoenergy.org\/2011%20MVP%20Portfolio%20Analysis%20Full%20Report117059.pdf\"><strong>MISO MVP Portfolio<\/strong><\/a> wasn&#8217;t enough, here&#8217;s what&#8217;s currently in the permitting process &#8212; <a href=\"https:\/\/cdn.misoenergy.org\/20220325%20LRTP%20Workshop%20Item%2002%20Tranche%201%20Portfolio%20and%20Process%20Review623633.pdf\"><strong>MISO &#8220;Tranche 1,&#8221;<\/strong><\/a> another big collection of high voltage transmission projects, centering on Minnesota. It looks like I&#8217;ve got work to do until I drop dead:<\/p>\n<p><img decoding=\"async\" class=\"wp-image-23578 aligncenter\" src=\"https:\/\/legalectric.org\/f\/2022\/07\/image-6.png\" alt=\"\" width=\"433\" \/><\/p>\n<p>The <a href=\"https:\/\/cdn.misoenergy.org\/2011%20MVP%20Portfolio%20Analysis%20Full%20Report117059.pdf\"><strong>MISO Multi Value Project Portfolio<\/strong><\/a>, more huge transmission lines in the Midwest:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-5298\" src=\"https:\/\/nocapx2020.info\/wp-content\/uploads\/2014\/04\/MVP-portfolio-map.jpg\" alt=\"\" width=\"526\" height=\"358\" srcset=\"https:\/\/nocapx2020.info\/wp-content\/uploads\/2014\/04\/MVP-portfolio-map.jpg 702w, https:\/\/nocapx2020.info\/wp-content\/uploads\/2014\/04\/MVP-portfolio-map-300x204.jpg 300w\" sizes=\"auto, (max-width: 526px) 100vw, 526px\" \/><\/p>\n<p>Remember the big picture of <a href=\"https:\/\/gridnorthpartners.com\/\">CapX 2020<\/a> oh so long ago &#8211; bulk power transfer from the North Dakota coal fields and generating plants through Minnesota and eastward:<\/p>\n<p><a title=\"capx2020-powerpoint-p-7-big-picture-map.jpg\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/capx2020-powerpoint-p-7-big-picture-map.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/capx2020-powerpoint-p-7-big-picture-map.jpg\" alt=\"capx2020-powerpoint-p-7-big-picture-map.jpg\" width=\"444\" height=\"343\" \/><\/a><br \/>\nHere&#8217;s the basic idea broken down into three projects as found in a September 06, 2005 letter formally announcing the project, a good indication of their intent:<\/p>\n<blockquote><p><a title=\"CapX 2020 - Letter September 6, 2005\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/capx-2020-proposed-lines.pdf\">CapX 2020 &#8211; Letter September 6, 2005<\/a><\/p><\/blockquote>\n<p>Here are the maps from that letter:<\/p>\n<p><a title=\"sw-mn-its-not-for-wind-map.jpg\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/sw-mn-its-not-for-wind-map.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/sw-mn-its-not-for-wind-map.jpg\" alt=\"sw-mn-its-not-for-wind-map.jpg\" width=\"436\" height=\"217\" \/> <\/a><\/p>\n<p><a title=\"prairie-island-roch-lax.jpg\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/prairie-island-roch-lax.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/prairie-island-roch-lax.jpg\" alt=\"prairie-island-roch-lax.jpg\" width=\"438\" height=\"291\" \/><\/a><\/p>\n<p><a title=\"northwest-part-2-fargo-to-metro.jpg\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/northwest-part-2-fargo-to-metro.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/northwest-part-2-fargo-to-metro.jpg\" alt=\"northwest-part-2-fargo-to-metro.jpg\" width=\"443\" height=\"388\" \/> <\/a><\/p>\n<p>Here are route maps from the Notice Plan, in pdf below the next map.\u00c2\u00a0 I had to fight like hell to get the existing transmission lines and a likely connector corridor shown on the maps and to have notice sent out to those in that corridor just north of 61 on top of the bluff where it runs east\/west.\u00c2\u00a0 This was a small win, but one step that shows that it&#8217;s all connected.\u00c2\u00a0 The blue part below is the corridor that the existing 345kV line runs along from the square corner it takes near Hampton (soon to be the new Hampton Corners substation) due east to Prairie Island:<\/p>\n<p><a title=\"Missing Link between SW and SE\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/missing-link.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/missing-link.jpg\" alt=\"Missing Link between SW and SE\" width=\"456\" height=\"256\" \/> <\/a><\/p>\n<p>Here&#8217;re the Notice Plans with their official maps of the potential corridors &#8212; everyone owning land within the red sections should have received notice:<\/p>\n<blockquote><p><a title=\"CapX - SW to SE corridor map\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/capx-sw_hampton_notice_plan_map.pdf\">CapX &#8211; SW to SE corridor map<\/a><br \/>\n<a title=\"CapX - SE Minnesota corridor map\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/capx-rochester_lacrosse_notice_plan_map.pdf\">CapX &#8211; SE Minnesota corridor map<\/a><\/p>\n<p><a title=\"CapX - NW to Metro corridor map\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/capx-nw_metro_notice_plan_map.pdf\">CapX &#8211; NW to Metro corridor map<\/a><\/p><\/blockquote>\n<p>If CapX&#8217;s SE line goes to Prairie Island and then south, it would either take a square corner to go south on top of the bluff where the existing line from Hampton meets the line coming out of Prairie Island, or it would join the existing line from Hampton as it goes down the bluff toward the reservation and Prairie Island nuclear plant.<\/p>\n<p>Here&#8217;s a photo that they included in the original Notice Plan to the PUC showing the route proposed (and I don&#8217;t think it&#8217;s changed a bit, but please, convince me I&#8217;m wrong).\u00c2\u00a0 Here&#8217;s the map in pdf so you can print yourself a big copy:<\/p>\n<blockquote><p><a title=\"Arial Photo - CapX from W into PI and then south\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/aerial-photo-route-pi.pdf\">Arial Photo &#8211; CapX from W into PI and then south<\/a><\/p><\/blockquote>\n<p>From Prairie Island or the bluff, it would then go south, along the existing Prairie Island-Byron line, right through the new Westwood subdivision.\u00c2\u00a0 Has someone told the developers and realtors selling lots and homes?\u00c2\u00a0 You betcha&#8230; I have&#8230; by phone and email.\u00c2\u00a0 Are they giving notice to prospective buyers?\u00c2\u00a0 Good question!<br \/>\n<a title=\"westwood-plat.jpg\" href=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/westwood-plat.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter\" src=\"http:\/\/www.nocapx2020.info\/wp-content\/uploads\/2007\/08\/westwood-plat.jpg\" alt=\"westwood-plat.jpg\" width=\"433\" height=\"530\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>It just never ends. They can&#8217;t ever have enough transmission, and the &#8220;Public&#8221; Utility\/Service Commissions haven&#8217;t seen a transmission they don&#8217;t like. As if CapX 2020 (now &#8220;Grid North Partners&#8221;) and the MISO MVP Portfolio wasn&#8217;t enough, here&#8217;s what&#8217;s currently <span class=\"excerpt-dots\">&hellip;<\/span> <a class=\"more-link\" href=\"https:\/\/nocapx2020.info\/?page_id=4\"><span class=\"more-msg\">Continue reading &rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-4","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/pages\/4","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4"}],"version-history":[{"count":2,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/pages\/4\/revisions"}],"predecessor-version":[{"id":6711,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/pages\/4\/revisions\/6711"}],"wp:attachment":[{"href":"https:\/\/nocapx2020.info\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}