{"id":4501,"date":"2012-10-10T16:41:00","date_gmt":"2012-10-10T23:41:00","guid":{"rendered":"http:\/\/nocapx2020.info\/?p=4501"},"modified":"2012-10-10T17:52:37","modified_gmt":"2012-10-11T00:52:37","slug":"capx-whats-goin-on","status":"publish","type":"post","link":"https:\/\/nocapx2020.info\/?p=4501","title":{"rendered":"CapX Compliance Filing &#8211; what&#8217;s goin&#8217; on?"},"content":{"rendered":"<p>Yesterday a filing came over the wire, and I finally got around to reading it.\u00c2\u00a0 Odd.\u00c2\u00a0 It&#8217;s a Compliance Filing, which means that Xcel is filing it to show that they&#8217;re in compliance with the CapX 2020 order, in this case it&#8217;s the Certificate of Need, docket 06-1115 (to see that docket, <a href=\"https:\/\/www.edockets.state.mn.us\/EFiling\/edockets\/searchDocuments.do?method=showeDocketsSearch&amp;searchType=new\"><strong><span style=\"color: #99cc00;\">GO HERE<\/span><\/strong><\/a> and search for docket 06-1115).<\/p>\n<blockquote><p><a href=\"https:\/\/nocapx2020.info\/wp-content\/uploads\/2012\/10\/fargocompliancereport-oct82012.pdf\">Xcel&#8217;s Fargo-St. Cloud Compliance Report &#8211; October 8, 2012<\/a><\/p><\/blockquote>\n<p>So looking at this, I note a couple of things, first, that they have to make this filing because we were on it at the Certificate of Need stage what seems like a hundred years ago now, and managed to get a requirement that they disclose ownership structure, ownership percentages, AND that they disclose the capacity of the line.\u00c2\u00a0 DUH!\u00c2\u00a0 Well, it wasn&#8217;t such a DUH then or we wouldn&#8217;t have had to fight so hard for that.\u00c2\u00a0 And here we are, now fully three years after that permit was issued, and they&#8217;re just disclosing ownership &#8212; see the link above.<\/p>\n<p>A while back, they filed a similar Compliance Filing for the Brookings-Hampton line:<\/p>\n<blockquote><p><a href=\"https:\/\/nocapx2020.info\/wp-content\/uploads\/2012\/10\/brookingscompliance.pdf\">Brookings Compliance Filing &#8211; January 26, 2011<\/a><\/p><\/blockquote>\n<p>And before that, they&#8217;d filed another one for the Fargo line:<\/p>\n<blockquote><p><a href=\"https:\/\/nocapx2020.info\/wp-content\/uploads\/2012\/10\/fargocompliancereport-aug-17-2011-20118-65498-01.pdf\">Fargo Compliance Report from PUC site August 17, 2011<\/a>:<\/p>\n<p><a href=\"https:\/\/nocapx2020.info\/wp-content\/uploads\/2012\/10\/fargo_msc_compliance_filing_08262010.pdf\">Fargo &#8211; MSC Compliance Filing August 20, 2010<\/a> found <a href=\"http:\/\/www.capx2020.com\/Regulatory\/State\/Minnesota\/pdf\/MSC_compliance_filing_08.26.2010.pdf\">HERE<\/a><\/p><\/blockquote>\n<p>The pattern is that they file a Compliance filing, and days later, the Dept. of Commerce files a &#8220;Compliance Closure&#8221; and it looks to me as if they receive the filing, say, &#8220;YUP, dat&#8217;s a filing,&#8221; check off the box, and file a Compliance Closure.<\/p>\n<blockquote><p>Filing 8\/20\/2010, Closure 8\/26\/2010<\/p>\n<p>Filing 1\/14\/2011, Closure 1\/19\/2011<\/p>\n<p>Filing 8\/17\/2011, Closure 8\/23\/2011<\/p><\/blockquote>\n<p>In their filings, addressing Ownership Structure, they talk of many agreements, but the agreements have not been filed.\u00c2\u00a0 They address &#8220;Project Owners&#8221; but no agreements on that either.\u00c2\u00a0 And then there&#8217;s &#8220;Transmission Capacity.&#8221;\u00c2\u00a0 They state the design capacity is 2.050 MVA, but the Certificate of Need is for a double circuited line with each circuit having a capacity of 2,050 MVA.\u00c2\u00a0 Hmmmmmm&#8230;<\/p>\n<p>So, representing No CapX 2020, United Citizens Action Network, and Citizens Energy Task Force, I fired off an Information Request to Xcel Energy, filer of the Compliance Report, and to the Dept. of Commerce, so they&#8217;ll notice that there are no agreements in their files (or turn them over if somehow there is something there!). And then I sent that and a few initial comments to the PUC&#8217;s Burl Haar and filed it:<\/p>\n<blockquote><p><a href=\"https:\/\/nocapx2020.info\/wp-content\/uploads\/2012\/10\/correspondence_xcelcommerce-oct-10-2012.pdf\">Correspondence to Xcel Energy and MN Dept of Commerce Oct 10, 2012<\/a><\/p>\n<p><a href=\"https:\/\/nocapx2020.info\/wp-content\/uploads\/2012\/10\/correspondence_puc-oct-10-2012.pdf\">Correspondence to Public Utilities Commission October 10, 2012<\/a><\/p><\/blockquote>\n<p>Time to sit back and wait&#8230;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Yesterday a filing came over the wire, and I finally got around to reading it.\u00c2\u00a0 Odd.\u00c2\u00a0 It&#8217;s a Compliance Filing, which means that Xcel is filing it to show that they&#8217;re in compliance with the CapX 2020 order, in this <span class=\"excerpt-dots\">&hellip;<\/span> <a class=\"more-link\" href=\"https:\/\/nocapx2020.info\/?p=4501\"><span class=\"more-msg\">Continue reading &rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[14,600,31,653,48,75],"class_list":["post-4501","post","type-post","status-publish","format-standard","hentry","category-uncategorized","tag-capx-2020","tag-citizens-energy-task-force","tag-no-capx-2020","tag-northern-states-power","tag-united-citizens-action-network","tag-xcel-energy"],"_links":{"self":[{"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/posts\/4501","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4501"}],"version-history":[{"count":4,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/posts\/4501\/revisions"}],"predecessor-version":[{"id":4511,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=\/wp\/v2\/posts\/4501\/revisions\/4511"}],"wp:attachment":[{"href":"https:\/\/nocapx2020.info\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4501"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4501"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nocapx2020.info\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4501"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}