Click link above and call or email them TODAY – PASS HR 1182!
Comments
HR1182 referred to Local Government Division — 1 Comment
To early to make an accurate conclusion to whether the high volt lines are needed because on proposed demand increases, but the HV lines are needed to energize the wind turbines proposed in the Dakota’s.See http://www.progressivesurvival.com-thecost
R.L. Philippi
Leave a Reply
HTML tags allowed in your
comment: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>
To early to make an accurate conclusion to whether the high volt lines are needed because on proposed demand increases, but the HV lines are needed to energize the wind turbines proposed in the Dakota’s.See http://www.progressivesurvival.com-thecost
R.L. Philippi