Transmission Costs
![](https://nocapx2020.info/wp-content/uploads/2019/07/20160403_173838-1024x576.jpg)
I’ve been noticing that in the transmission applications for… at least a decade now… that they don’t provide the costs estimates as they did previously. For example, for the Arrowhead Project, there was a detailed estimate of everything down to the cost of the structures, the wires, salvage value of removed lines, land cost, etc., and now, it’s just one number, plus contingency (at a much higher percentage that earlier) and AFUDC. They say they use MISO cost numbers, but don’t provide that info.
Well, lookie what I found:
Soooooo…. back to looking up info on claim that this Dodge County Wind 345kV is part of the “regional grid.”
![](https://nocapx2020.info/wp-content/uploads/2019/07/20186-144409-01_Map9_2011-GAP-LandCoverMap-1024x663.jpg)
Haven’t seen anything in this area since the utility pipedream of WRAO, most of which is already built.
![](https://nocapx2020.info/wp-content/uploads/2011/05/wraomap.jpg)
It’s my belief that ITC’s MVP lines 3 and 4 connecting from Lakefield Jct., and heading into the northern part of Iowa was the rest of the “I-90” line, but perhaps not? Time will tell… as will the MTEP!